How a Roof Restoration Works

A roof restoration is a sequence, and the order matters: inspect, protect, clean, repair, rebed and repoint, prepare, then coat. Coating is the last step, never the fix. Here is what happens on a tile roof and on a metal roof.

Get a Free Written Quote

Four quick questions. No email needed.

By submitting you agree to our privacy policy.

Roofer in a harness applying membrane coating to a prepared concrete tile roof
Illustration.

Tile Roof Restoration, Step by Step

  1. Inspection

    Tiles, ridges, valleys, flashings and gutters checked for cracks, failed bedding, moss and leaks, with photos.

  2. Site protection

    Gardens, paths, windows, cars and solar panels covered or moved where needed.

  3. Cleaning

    Moss, lichen and loose surface removed, with pressure and technique suited to the tile.

  4. Tile repairs

    Broken and cracked tiles replaced with matching profiles.

  5. Rebedding and repointing

    Failed bedding replaced, then flexible pointing applied over sound bedding.

  6. Preparation

    Roof checked dry and clean, and any moss treatment applied.

  7. Sealer and topcoats

    Primer or sealer, then topcoats, to the coating maker's specification.

  8. Final check and clean-up

    Roof walked again, gutters and ground cleared, photos supplied.

Flexible pointing being applied along ridge capping on a concrete tile roof
Illustration.

Metal Roof Restoration, Step by Step

  1. Inspection

    Sheets, screws, flashings and penetrations checked for rust, holes and lifting.

  2. Cleaning

    Dirt, chalking and loose paint removed.

  3. Rust treatment

    Surface rust cleaned back and treated with compatible products.

  4. Fixings

    Loose or rusted screws and washers replaced.

  5. Sheet and flashing repairs

    Holed sheets replaced and flashings refixed or resealed.

  6. Primer

    A primer made for the metal type.

  7. Topcoats

    Protective topcoats in your colour, to specification.

  8. Final check and clean-up

    Roof inspected, swarf and debris cleared, photos supplied.

Preparation matters most on metal: a coating cannot make up for badly corroded or structurally weak sheets. See metal roof restoration.

The Coating System

Most systems are a primer or sealer followed by topcoats, applied to the coating maker's specification for that roof material. Concrete tiles, terracotta and metal each need different products. A good quote names each product and the number of coats, and you can ask for the technical data sheet.

Weather and Curing

Rain, high humidity, strong wind, temperature extremes and damp surfaces all stop coating. Melbourne weather changes quickly, so coating days are chosen around the forecast and the rain-free curing window on the product's data sheet. A delayed coat is better than one washed off before it cures.

Protecting the Property

Cleaning creates runoff and can dislodge moss and debris. Garden beds, paths, outdoor furniture, cars, windows and solar panels should be protected or moved, and runoff kept away from neighbours' yards and stormwater where needed.

Handover

At the end, the roof is walked again, gutters and ground are cleared and surrounding surfaces rinsed. You should get photos of the completed work and the warranty paperwork.

More Melbourne Roof Guides

Process FAQs

How long does a roof restoration take?

A straightforward home usually takes several working days. Roof size, condition, repairs, access and weather change that, and coating has to wait for suitable conditions. Ask for an estimated schedule before work starts.

Do I need to be home during the work?

Usually not for the whole job. Someone should arrange access, talk through any concerns beforehand and confirm outside water and power if needed. Tenants should have the work arranged through their landlord or property manager.

What weather stops roof coating?

Rain, high humidity, strong wind, very hot or cold temperatures and damp surfaces. Melbourne weather turns quickly, so rescheduling is better than coating in poor conditions.

How long does a coating need before rain?

It depends on the product, thickness, temperature and humidity. The manufacturer's technical data sheet sets the rain-free window, and the schedule should allow for it.